Instantly estimate UK house build, extension, renovation & loft costs by region and finish level, with VAT included.
House Build & Renovation Cost Calculator
2026 UK prices by region, with VAT worked out the HMRC way
- VAT follows HMRC's own rules (VAT Notice 708): 0% on new-build construction, 20% on professional fees, extensions and lofts, and 5% on works to homes that have been empty for two years or more.
- Planning fees match the current England schedule: £548 for a householder application and £610 per new dwelling.
- Build rates are checked against up-to-date UK cost guides and adjusted for all ten UK regions.
- The total is the sum of the lines you see, so the breakdown always adds up to the pound.
- Every formula, the mortgage maths included, was tested against hand calculations before it went live.
It is still an estimate, not a quote. Use it to set a realistic budget, then ask three local firms to price the job.
Quick answer: building a typical house in the UK currently costs roughly £2,500 to £3,000 per m² for the construction alone. Add professional fees, planning, a warranty, contingency and VAT on fees, and the all-in figure for an average 120 m² home comes out nearer £3,200 per m², or about £388,000 in the Midlands. Extensions, loft conversions and renovations all have their own prices, and every one of them is in the calculator above.
Maybe you've just bought a plot. Maybe you're wondering what a kitchen extension would do to your savings, or whether a dormer loft is realistic this year. Either way you want a proper number before you start ringing builders, and a shrug and an "it depends" doesn't help anyone. That's why we built this house build cost calculator UK homeowners, self-builders and landlords can use for free. Pick the job, type in the floor area, choose your region and finish level, and it works out the construction cost, fees, contingency and VAT, then gives you a likely range and a monthly repayment.
Think of it as a UK home improvement cost calculator for the big jobs: one tool, four project types. Use it as a house construction cost calculator for a new build, as an extension cost calculator, as a renovation cost calculator, or as a loft conversion cost calculator. This guide shows you how to use every part of it, what the numbers mean, and how to sense-check any quote that lands on your doormat.
Starting rates at a glance (per m², Midlands, before fees, contingency and VAT)
How much does it cost to build a house in the UK?
Build It magazine's self-build cost guide puts a typical self-build, delivered by a main contractor to a decent specification, at £2,500 to £3,000 per m². A simple, self-managed project can come in nearer £2,200, and a high-end design with lots of bespoke detailing can pass £3,200. The calculator's Standard finish sits comfortably inside that band at £2,500 per m², with Premium at £3,150 and Luxury at £4,200.
The catch is that the per-m² rate only covers the construction bill. Take a 120 m² detached two-storey house in the Midlands at Standard finish. The build itself is £300,000. On top of that you've got an extra bathroom, architect and engineer fees at 12%, a 10% contingency, a 10-year warranty, planning and building control, and VAT on the fees. Once those are in, the calculator shows £388,042, which is £3,234 per m². That is roughly £88,000 (nearly 30%) more than you'd get from the headline rate alone, and it's the gap that catches a lot of first-time builders out.
Table 1: New build cost by house size (detached, two storeys, Standard finish, Midlands, one extra bathroom, 12% fees, 10% contingency, warranty, planning and building control, no land)
| Floor area | Build cost | All-in | Per m² | Time |
|---|---|---|---|---|
| 80 m² about 2-bed | £200,000 | £262,642 | £3,283 | 6–8 months |
| 100 m² about 3-bed | £250,000 | £325,342 | £3,253 | 8–11 months |
| 120 m² default | £300,000 | £388,042 | £3,234 | 8–11 months |
| 150 m² about 4-bed | £375,000 | £482,092 | £3,214 | 10–14 months |
| 200 m² about 5-bed | £500,000 | £638,842 | £3,194 | 10–14 months |
Notice that the all-in cost per m² drifts down as the house gets bigger, from £3,283 at 80 m² to £3,194 at 200 m². Fixed items like planning fees and the bathroom allowance get spread over more floor area. The drop is small, though. Don't expect a big bulk discount for building a bigger house.
Chart 1: the same 120 m² house at four finish levels (all-in total)
That chart is worth a long look. Same size, same plot, same region, and the total swings from £308,413 to £658,906 purely on specification. If a budget feels tight, finish level is the first thing to examine, well before you start shaving square metres off the plans.
Building cost per square metre in the UK, and per square foot
Builders, quantity surveyors and mortgage valuers all think in cost per m² of floor area, because it strips out the size of the house and lets you compare projects fairly. Plenty of people still think in square feet, so the calculator has an m² / ft² switch beside every area box. If you're searching for the cost per square foot to build a house in the UK, divide any per-m² figure by 10.76. At Standard finish that works out at about £232 per ft² for a new build.
Table 2: The calculator's base rates (Midlands, before regional multiplier, fees, contingency and VAT)
| Project | Level or type | Per m² | Per ft² |
|---|---|---|---|
| New build | Budget | £2,000 | £186 |
| Standard | £2,500 | £232 | |
| Premium | £3,150 | £293 | |
| Luxury | £4,200 | £390 | |
| Extension (single storey) | Budget | £1,800 | £167 |
| Standard | £2,400 | £223 | |
| Premium | £3,000 | £279 | |
| Luxury | £3,800 | £353 | |
| Renovation | Light refresh | £700 | £65 |
| Full renovation | £1,400 | £130 | |
| Structural work | £2,200 | £204 | |
| Loft conversion (Standard) | Rooflight | £1,700 | £158 |
| Rear dormer | £2,000 | £186 | |
| Hip-to-gable | £2,300 | £214 | |
| Mansard | £2,700 | £251 |
Chart 2: Standard-level rate per m² by project type
The base rate is only the starting point. The calculator then nudges it up or down for the things that genuinely change the price of a build, and each one is a separate choice you can see and control.
Table 3: Multipliers applied on top of the base rate
| What you choose | How it changes the rate |
|---|---|
| House type (new build) | Detached ×1.00, semi-detached ×0.95, terraced ×0.90, bungalow ×1.00, self-build (bespoke) ×1.05. Shared walls save money. |
| Storeys (new build) | One storey ×1.15, two ×1.00, three ×0.96, four ×0.93. A bungalow needs more roof and foundation for the same floor area. |
| Extension type | Single storey ×1.00, double storey ×0.85, wraparound ×1.15, basement ×1.60. |
| Setting | Standard plot ×1.00, conservation area ×1.15, listed building ×1.30, green belt ×1.10. |
| Ground conditions | Easy ×1.00, average ×1.08, difficult ×1.20. |
| Energy standard (new build) | Building regs ×1.00, EPC A-rated ×1.06, Passivhaus ×1.15. |
| Region | Inner London ×1.42 down to Northern Ireland ×0.85 (see the regional table below). |
How to use this house build and renovation cost calculator
This is the part most people skip, and it's usually why they end up with a number that looks odd. It takes about two minutes. Work down the steps below and every box on the screen will make sense, whether you're using it as a house construction cost calculator for a brand-new home or to price an extension, renovation or loft.
Choose your project
Four coloured tabs run across the top: New build, Extension, Renovation and Loft. Tap the one that matches your job. Each project has its own colour and the whole calculator, drawing panel included, switches to match, so you always know which job you're pricing. Whatever you typed on one tab is still there when you come back to it, which makes it easy to price an extension and a loft conversion side by side before you decide which to do first.
Read the drawing panel
The dark panel on the left (a slim strip across the top on a phone) isn't just decoration. It redraws your project as a simple architectural line drawing whenever you change something. Switch the house type from detached to terraced and the neighbouring houses appear. Add a storey and another floor stacks up. On the extension tab you'll see a single-storey box, a taller double-storey addition, a wraparound or a basement below the ground line. The loft tab draws a rooflight, a rear dormer, a hip-to-gable or a mansard, and on the renovation tab a light refresh gets a few sparkles, a full renovation gets scaffolding and structural work adds a steel beam as well.
A small title block under the drawing repeats the project, area, region and finish level, so you can spot a typo (120 m² instead of 12 m², say) before you press anything.
Fill in the project details
This is where the price is really decided. Under Project details you'll find the main inputs, and they differ a little from one project to the next. Two apply everywhere:
- Floor area. Measure inside the external walls on every floor (gross internal area). Type it in square metres, or tap the small ft² switch to work in square feet. The calculator converts exactly (1 m² is 10.7639 ft²), and flipping back and forth won't shift your number.
- Finish level. This sets the base rate per m², and it's the biggest single lever in the whole calculator. Chart 1 above shows how much it matters.
The guides below list every field for each project, where you'll find it, and what it does to the cost.
Field guide: new build
| Field | Tab | What it does |
|---|---|---|
| Floor area | Details | Total floor area across all storeys. The rates are built for roughly 25 to 1,000 m²; outside that range you get a warning. |
| Region | Details | One of ten UK regions. Moves the whole build rate up or down from the Midlands baseline. |
| House type | Details | Detached, semi-detached, terraced, bungalow or self-build (bespoke). Changes the rate and redraws the house. |
| Storeys | Details | A plus/minus stepper from 1 to 4. Choose bungalow and it locks to a single storey. |
| Setting | Details | Standard plot, conservation area, listed building or green belt. |
| Extra kitchens / bathrooms | Details | Anything beyond the basic allowance already in the m² rate. Priced by finish level and region (see the allowance table below). |
| Contingency | Details | 5%, 10%, 15% or 20% of the build, kitchens and bathrooms. Default is 10%. |
| Finish level | Details | Budget £2,000, Standard £2,500, Premium £3,150 or Luxury £4,200 per m². |
| Professional fees | Extras | 12% of the build, kitchens and bathrooms: architect, structural engineer, project manager or QS. Carries 20% VAT. |
| Planning & building control | Extras | £610 for the planning application (one new dwelling, England) plus £1,200 for building control. |
| 10-year warranty | Extras | 1% of the build cost. Most lenders insist on a structural warranty. |
| Demolition | Extras | Area × an access rate of £80 (easy), £90 (average) or £105 (difficult) per m². Zero-rated for VAT when it is part of the same project. |
| Utility connections | Extras | £14,000 on mains, £24,000 for a long run or rural site, £35,000 off-mains. |
| Ground conditions | Extras | Easy ×1.00, average ×1.08, difficult ×1.20. |
| Energy standard | Extras | Building regs, EPC A-rated (×1.06) or Passivhaus (×1.15). |
| Land cost | Extras | Your plot price. Added at the end with no VAT and kept out of the likely range and per-m² figures. |
Field guide: extension
| Field | Tab | What it does |
|---|---|---|
| Extension area | Details | Floor area of the new space only, not the house it attaches to. |
| Region / Setting | Details | Same choices as the new build tab. |
| Extension type | Details | Single storey, double storey (×0.85), wraparound (×1.15) or basement (×1.60). |
| Ground conditions | Details | Easy, average or difficult. Matters most for basements and deep foundations. |
| New kitchens / bathrooms | Details | Up to two kitchens and three bathrooms inside the new space. |
| Contingency | Details | Default 10%. |
| Finish level | Details | Budget £1,800, Standard £2,400, Premium £3,000 or Luxury £3,800 per m². |
| Professional fees | Extras | 12% of the build, kitchens and bathrooms. |
| Planning permission | Extras | £548 householder fee (England). Switch it off if your extension is permitted development. |
| Building control | Extras | £700 typical charge. |
| Party wall agreement | Extras | £1,200 allowance for surveyor fees where you share a wall or build near the boundary. |
| Remove existing structure | Extras | Area × access rate, for knocking down a conservatory, garage or lean-to first. |
Field guide: renovation
| Field | Tab | What it does |
|---|---|---|
| Area renovated | Details | The floor area you are actually working on. |
| Region / Setting | Details | Same choices as the other tabs. |
| New kitchens / bathrooms | Details | Up to three kitchens and four bathrooms. |
| Contingency | Details | 10%, 15% or 20%. Default is 15%, because older houses hide surprises. |
| Scope of work | Details | Light refresh £700, full renovation £1,400 or structural work £2,200 per m². |
| Professional fees | Extras | 12% of the works, kitchens and bathrooms. |
| Building control | Extras | £550 typical charge for notifiable work. |
| Empty 2+ years | Extras | Applies the 5% reduced VAT rate to the building work (fees stay at 20%). |
| Strip-out | Extras | Area × access rate for taking out old kitchens, plaster, floors and partitions. |
Field guide: loft conversion
| Field | Tab | What it does |
|---|---|---|
| Usable area added | Details | The floor area of the new room or rooms, not the footprint of the roof. |
| Region / Setting | Details | Same as the other tabs (green belt isn’t offered, because it doesn’t apply to lofts). |
| Conversion type | Details | Rooflight £1,700, rear dormer £2,000, hip-to-gable £2,300 or mansard £2,700 per m². |
| Contingency | Details | 5% to 20%. Default 10%. |
| Finish level | Details | Standard, Premium (×1.20) or Luxury (×1.45). |
| Professional fees | Extras | 12% of the build and en-suite. |
| Planning permission | Extras | £548 householder fee. Off by default, because many lofts are permitted development. |
| Building control | Extras | £650 typical charge. |
| Party wall agreement | Extras | £1,000 allowance. Semis and terraces nearly always need one. |
| En-suite bathroom | Extras | £9,000 in the Midlands, adjusted for your region. |
Table 4: Kitchen and bathroom allowances (Midlands, multiplied by your region). Renovation uses the first three rows for its three scopes.
| Finish level | Extra kitchen | Extra bathroom |
|---|---|---|
| Budget (Light refresh) | £8,000 | £4,500 |
| Standard (Full renovation) | £14,000 | £8,000 |
| Premium (Structural work) | £22,000 | £13,000 |
| Luxury | £32,000 | £20,000 |
Open Extras & fees
Tap Extras & fees to see everything that sits on top of the build price. Each extra is a pill you switch on or off, and a green tick means it's included. The little number beside the tab shows how many are currently ticked, so nothing gets forgotten. Some extras open extra boxes (demolition area, site access, utility type) that stay greyed out until you switch the matching pill on.
The defaults are the choices most projects need: professional fees, building control and, for a new build, planning and a warranty. Untick anything that doesn't apply to you, for example planning permission if your extension is covered by permitted development.
Press Calculate (and Reset)
Nothing is worked out until you press the green Calculate cost button, so you can change as many fields as you like without the numbers jumping around. Press it and a scan line sweeps over the drawing, then your results slide in. The small red button beside it is Reset. It puts the current tab back to its starting values and leaves your other tabs alone.
If you leave the area blank, the calculator points you to the box instead of guessing a figure. If the area is unusually small or large for the rates it's built on, a warning appears above the breakdown.
Read your results
The left panel now shows your headline figures: the estimated total (it counts up as it appears), a likely range, the all-in cost per m² and a typical build time. On the right there are three tabs:
- Breakdown shows a coloured bar and a line-by-line list: construction, kitchens and bathrooms, fees, planning, contingency, demolition, utilities, warranty, VAT and land. This is the one to hold up against a builder's quote.
- By region shows the build rate for your exact specification in all ten UK regions, with yours highlighted. It's before extras, fees and VAT, so it compares like with like.
- Monthly cost lets you choose a deposit, an interest rate and a term. It works out the monthly repayment, the amount borrowed, the total interest and the total repaid.
Two buttons sit underneath. Edit details takes you back to your inputs with everything still filled in. Copy summary copies the result as plain text you can paste into an email, a WhatsApp message or your notes app.
Worked example: a 120 m² new build, line by line
Here is exactly how the default new build total is put together, so you can see there is no black box.
Table 5: Default new build, line by line
| Line | How it is worked out | Amount |
|---|---|---|
| Construction | 120 m² × £2,500 | £300,000 |
| Extra bathroom | Standard allowance | £8,000 |
| Professional fees | 12% of £308,000 | £36,960 |
| Contingency | 10% of £308,000 | £30,800 |
| 10-year warranty | 1% of £308,000 | £3,080 |
| Planning & building control | £610 + £1,200 | £1,810 |
| VAT on professional fees | 20% of £36,960 | £7,392 |
| Total | Sum of the lines above | £388,042 |
What the "likely range" means
Under the total you'll see a range, for example £349,200 to £446,200 on the build above. It's the total (without land) minus 10% at the low end and plus 15% at the high end, rounded to the nearest £100. The range leans upward on purpose, because building bills tend to drift up more often than they drift down. Treat the total as the middle of your planning budget and the top of the range as the figure you'd want to be able to survive.
Extension cost calculator: what a UK extension really costs
An extension is the job most households tackle first, and it's also the one where the headline rate misleads people most. Industry guides, including figures attributed to the Federation of Master Builders, put a single-storey extension at roughly £1,800 to £3,000 per m² nationally, with London and the South East often 20 to 40% higher. The extension tab starts from the same ground: £1,800 for a budget job, £2,400 standard, £3,000 premium and £3,800 luxury per m² in the Midlands.
Then the rest of the project piles on. A standard 20 m² single-storey extension has a build price of £48,000. Add 12% for design fees, 10% contingency, a planning fee and building control, then 20% VAT on the work, and the calculator lands on £71,520, or £3,576 per m² all-in. Unlike a new build, an extension carries the full 20% VAT, and that is the main reason the all-in number sits so far above the rate you'll hear quoted.
Table 6: Cost to extend a house, calculator results by size (single storey, Standard finish, Midlands, 12% fees, planning, building control, 10% contingency, VAT)
| Extension size | All-in total | All-in per m² | Build time |
|---|---|---|---|
| 10 m² | £36,384 | £3,638 | 12–16 weeks |
| 15 m² | £53,952 | £3,597 | 12–16 weeks |
| 20 m² (default) | £71,520 | £3,576 | 16–22 weeks |
| 30 m² | £106,656 | £3,555 | 16–22 weeks |
| 40 m² | £141,792 | £3,545 | 22–30 weeks |
In the calculator the all-in rate eases from £3,638 at 10 m² to £3,545 at 40 m², because the planning and building control fees are spread over more floor area. The saving is small, so don't plan on a bargain for going bigger.
Chart 3: all-in cost per m² for a 20 m² extension, by type
A double-storey extension is cheaper per m² (we apply ×0.85) because one set of foundations and one roof serve two floors. A wraparound costs more (×1.15) thanks to the awkward junctions where new walls meet the old house. A basement is the expensive outlier at ×1.60. One guide we checked suggests basements can run 50 to 100% above the cost of space above ground, depending on ground conditions and access.
Cost to extend a house: three things to check before you rely on any calculator
- Planning. Many single-storey rear extensions are permitted development, but conservation areas, flats and homes that have already been extended can change that. If you do need permission, the current householder fee in England is £548. That's the figure the calculator uses when "Planning permission" is ticked.
- Building control. You need building regulations approval whether or not you need planning permission, and the council's charge is usually based on size or estimated cost.
- Party walls. Building on or near a shared boundary usually means serving notice on your neighbour. The Party wall pill adds a £1,200 allowance for surveyor fees.
Loft conversion cost calculator: prices by conversion type
A loft conversion is usually the cheapest way to add a proper bedroom, because the walls, floor and roof already exist. Most current price guides put UK loft conversions somewhere between roughly £1,200 and £2,800 per m², and the type of conversion explains most of that spread. The loft conversion cost calculator on the Loft tab uses £1,700 (rooflight), £2,000 (rear dormer), £2,300 (hip-to-gable) and £2,700 (mansard) per m² at Standard finish in the Midlands, then multiplies by 1.20 for Premium and 1.45 for Luxury.
Table 7: Loft conversion cost by type (28 m² of new floor space, Standard finish, Midlands, 12% fees, building control, 10% contingency, VAT)
| Conversion type | All-in total | All-in per m² | Build time |
|---|---|---|---|
| Rooflight (Velux) | £70,336 | £2,512 | 4–6 weeks |
| Rear dormer (default) | £82,634 | £2,951 | 6–9 weeks |
| Hip-to-gable | £94,932 | £3,390 | 7–10 weeks |
| Mansard | £111,328 | £3,976 | 9–13 weeks |
- Rooflight (Velux): windows set into the existing roof slope with no change to the roof shape. Quickest and cheapest, but you need decent headroom already. Around 2.2 m at the highest point is the usual starting point.
- Rear dormer: a box built out from the back slope that adds headroom and floor space. It's the most common conversion in the UK, and the one most semis and terraces end up with.
- Hip-to-gable: for houses with a sloping side roof. The slope is built up into a vertical wall to gain internal volume, and it's often paired with a rear dormer.
- Mansard: the roof is reshaped into a near-vertical rear slope with a flat top. It gives the most space, costs the most, and usually needs planning permission.
Rooflight conversions and many dormers can be permitted development, provided you stay inside the volume limits (40 m³ of extra roof space for terraced houses, 50 m³ for semis and detached). Mansards and anything that changes the front roof slope normally need planning permission, and flats and some designated areas have tighter rules, so check with your council first. An en-suite adds £9,000 in the Midlands (£12,780 in Inner London), and semis and terraces almost always need a party wall notice because the new steelwork bears on the shared wall.
Table 8: Rear dormer by size (Standard finish, Midlands)
| New floor area | All-in total | All-in per m² |
|---|---|---|
| 20 m² | £59,210 | £2,961 |
| 28 m² (default) | £82,634 | £2,951 |
| 35 m² | £103,130 | £2,947 |
| 45 m² | £132,410 | £2,942 |
See how flat the per-m² figure stays, at about £2,950? A loft has far fewer fixed costs than an extension, so the price follows the floor area closely.
Renovation cost calculator: light refresh, full renovation or structural
Renovation is the hardest job to price, because you never quite know what's behind the plaster. The renovation cost calculator copes by offering three scopes and a higher default contingency of 15%.
- Light refresh (£700 per m²): decorating, new flooring, minor repairs and cosmetic work, with no major services or structural changes.
- Full renovation (£1,400 per m²): the whole-house treatment: rewiring, replumbing, new heating, replastering and fresh finishes throughout.
- Structural work (£2,200 per m²): walls removed or moved, steel beams, new openings and layout changes, the kind of project that needs an engineer and building control sign-off.
Table 9: Renovation cost for a 90 m² house (Midlands, one new kitchen and bathroom, 12% fees, building control, 15% contingency, VAT at 20%)
| Scope | All-in total | All-in per m² | Build time |
|---|---|---|---|
| Light refresh | £115,612 | £1,285 | 4–8 weeks |
| Full renovation (default) | £226,102 | £2,512 | 8–16 weeks |
| Structural work | £355,642 | £3,952 | 16–28 weeks |
The 5% VAT rule for empty homes
If a house has not been lived in for two years or more before the work starts, HMRC lets builders charge the reduced rate of 5% VAT on the renovation work. Tick Empty 2+ years and the calculator applies it. On the full renovation above, that takes the total from £226,102 to £200,572, a saving of £25,530. Professional fees stay at 20%, and HMRC excludes a few items (scaffolding, carpets and fitted furniture, for instance) from the reduced rate, so your real saving may be slightly smaller. Keep proof of the empty period, such as council tax records, the electoral roll or a letter from the council's empty homes officer.
Self build cost calculator: the costs people forget
When people search for a self build cost calculator, what they really want is the whole figure, not just the bricks and mortar. The New build tab is built for that. These are the items that most often go missing from a first budget, and whether the calculator handles them:
Table 10: Often-forgotten self-build costs
| Cost | Typical size | Included? |
|---|---|---|
| Land | Your plot price | Yes. Type it in the Land cost box. No VAT, and kept out of the range. |
| Stamp duty on the land | Charged on the plot, not on the build | No. Our UK mortgage calculator suite includes a stamp duty tool. |
| Utility connections | £14,000 on mains up to £35,000 off-mains in the calculator | Yes |
| Structural warranty | Often £1,500 to £3,500; calculator uses 1% of the build | Yes |
| Professional fees | 10% to 15% is typical; calculator uses 12% | Yes |
| Planning and building control | £610 plus £1,200 | Yes |
| Difficult ground | Easy, average or difficult adds 0%, 8% or 20% | Yes |
| Site insurance | Usually a four-figure sum | No |
| Community Infrastructure Levy | Self-builders can claim an exemption, but you must apply before work starts | No |
| Interest during the build | Depends on the lender and how funds are released | Partly. The Monthly cost tab shows a repayment on the finished total. |
| Landscaping, driveway, furniture | Varies enormously | No |
Build costs by region across the UK
Labour typically makes up somewhere around 40 to 50% of a build bill, and labour rates swing a lot around the country. That's why the identical house costs very different amounts depending on where you build it. The calculator uses ten regions, with the Midlands as the baseline. For the same 120 m² house, the gap between Inner London and Northern Ireland is £220,153.
Chart 4: new build rate per m² at Standard finish, by region
Table 11: Regional build costs (Standard finish; the 120 m² figures use the default new build settings)
| Region | Multiplier | Rate per m² | 120 m² total |
|---|---|---|---|
| Inner London | ×1.42 | £3,550 | £550,260 |
| Outer London | ×1.25 | £3,125 | £484,600 |
| South East | ×1.15 | £2,875 | £445,977 |
| South West | ×1.05 | £2,625 | £407,354 |
| East of England | ×1.02 | £2,550 | £395,767 |
| Midlands | ×1.00 | £2,500 | £388,042 |
| Scotland | ×0.90 | £2,250 | £349,419 |
| North England | ×0.88 | £2,200 | £341,694 |
| Wales | ×0.87 | £2,175 | £337,832 |
| Northern Ireland | ×0.85 | £2,125 | £330,107 |
Two honest caveats. Regional multipliers are averages, so a builder in a pricey town in the North can still out-charge the table. And for Scotland, Wales and Northern Ireland the build rates are adjusted, but the statutory fees in the calculator follow the England schedule, so check your local planning and building control charges for those lines.
VAT on building work: what the calculator assumes
VAT is where plenty of online calculators quietly go wrong. Charge 20% on everything and you overstate a new build. Ignore VAT altogether and you understate an extension by a fifth. This calculator follows HMRC's own published VAT guidance for the building and construction industry (VAT Notice 708).
Table 12: How VAT is treated, by item
| Work | VAT rate in the calculator | Why |
|---|---|---|
| Building a new home from scratch | 0% | Construction of a qualifying new dwelling is zero-rated, materials fitted by the builder included. |
| Demolition and site clearance as part of the same new build project | 0% | HMRC treats it as closely connected to the construction. |
| First-time utility connections to the new house | 0% | Part of the work that lets the new building be used. |
| Architect, surveyor, engineer and project management fees | 20% | These services are always standard-rated. |
| Extension to an existing house | 20% | No relief for an ordinary extension. |
| Loft conversion | 20% | Work to an existing home is standard-rated. |
| Renovating an ordinary occupied home | 20% | Standard rate applies. |
| Renovating a home empty for two years or more | 5% on works, 20% on fees | Reduced rate for renovating long-term empty homes. |
| Party wall surveyor fees | 20% | A professional service. |
| Planning fee | None added | A statutory charge set by government. |
| Building control | None added | The typical council charges we use are normally quoted VAT-inclusive. |
| Land | None added | Not added to the build cost. |
| Structural warranty | None added | An insurance product. |
If you're building your own home, there's a second piece to the puzzle. HMRC runs a VAT refund scheme for self-builders that lets you claim back VAT paid on building materials for a qualifying new home, normally within three months of completion. The calculator doesn't subtract any refund, so your real cost could be lower than the figure shown. One warning from HMRC's own guidance: the scheme only refunds VAT that was correctly charged. If a builder bills you 20% for constructing a brand-new house, ask them to explain before you pay.
Planning, building control and party wall fees
These are the small lines that people forget until the invoices start arriving. Planning fees are set nationally. Building control and party wall costs are not, so treat the calculator's figures as typical rather than exact.
Table 13: Statutory and professional fees
| Fee | In the calculator | What to expect in real life |
|---|---|---|
| Householder planning application (England) | £548 | Current fixed fee for alterations and extensions to a single house. |
| Planning application, one new house (England) | £610 | Current fixed fee per dwelling where fewer than 10 homes are proposed. |
| Building control, new house | £1,200 | Councils set their own scales. Single-house charges often land between the high hundreds and low thousands. |
| Building control, extension | £700 | Roughly £600 to £1,100 in the council schedules we checked, depending on size. |
| Building control, loft conversion | £650 | Roughly £550 to £1,250 in the schedules we checked. |
| Building control, renovation | £550 | Depends on the work. Notifiable jobs such as removing a load-bearing wall are charged individually. |
| Party wall agreement | £1,200 (extension), £1,000 (loft) | Current guides quote about £900 to £1,800 for one agreed surveyor, and £1,800 to £3,500 if each neighbour appoints their own. The building owner normally pays both. |
Scotland, Wales and Northern Ireland have their own planning and building regulation systems, so always check the local rules before you talk to your neighbours or submit an application.
Where the money goes on a typical new build
- Construction£300,000 · 77.3%
- Professional fees£36,960 · 9.5%
- Contingency£30,800 · 7.9%
- Extra bathroom£8,000 · 2.1%
- VAT on fees£7,392 · 1.9%
- 10-year warranty£3,080 · 0.8%
- Planning and building control£1,810 · 0.5%
Chart 5: the default 120 m² new build, split by cost. Construction is about 77% of the bill. The other 23% is where budgets quietly break: fees, contingency and VAT on fees alone add up to nearly a fifth (19%) of the total, and none of them show up in a headline per-m² rate. The calculator's Breakdown tab draws exactly this picture for your own project.
How long will the work take?
The calculator also gives a typical build time. These are on-site durations from the day the builders start, so add time before that for design, planning and building control approval, which can easily take several months.
Table 14: Typical build times used by the calculator
| Project | Size or type | Typical time on site |
|---|---|---|
| New build | Under 90 m² | 6–8 months |
| 90 to 149 m² | 8–11 months | |
| 150 to 249 m² | 10–14 months | |
| 250 m² and over | 14–20 months | |
| Extension | Under 20 m² | 12–16 weeks |
| 20 to 39 m² | 16–22 weeks | |
| 40 m² and over | 22–30 weeks | |
| Renovation | Light refresh | 4–8 weeks |
| Full renovation | 8–16 weeks | |
| Structural work | 16–28 weeks | |
| Loft conversion | Rooflight | 4–6 weeks |
| Rear dormer | 6–9 weeks | |
| Hip-to-gable | 7–10 weeks | |
| Mansard | 9–13 weeks |
Monthly cost of a loan or mortgage
Open the Monthly cost tab and the calculator turns your total into a repayment. Using the standard repayment formula, a 25-year loan on the default new build with a 20% deposit at 5.5% costs £1,906.33 a month. You'd borrow £310,434, repay £571,900 in all, and pay £261,467 of that in interest.
Chart 6: where each repayment pound goes (25 years at 5.5%)
Table 15: Monthly repayment on the default £388,042 new build over 25 years
| Deposit | At 4.5% | At 5.5% | At 6.5% |
|---|---|---|---|
| 10% deposit | £1,941.18 | £2,144.63 | £2,358.08 |
| 20% deposit | £1,725.49 | £1,906.33 | £2,096.07 |
| 30% deposit | £1,509.80 | £1,668.04 | £1,834.06 |
Two practical points. First, 5.5% is just the starting figure on the calculator. Mortgage and loan rates move, so type in the rate you've actually been quoted. Second, self-build mortgages work differently to a normal home loan: lenders usually release the money in stages as the build progresses, and many allow interest-only payments while you're building, so early monthly costs are often lower than the table suggests. For extensions, lofts and renovations the default is 6.5% over 10 years, which suits a typical home improvement loan or further advance. If you want to compare deals, try our UK mortgage calculator suite.
Ten ways to keep your budget under control
- Start with finish level. Run the same project at Budget, Standard and Premium. The gap is usually bigger than any other decision you'll make.
- Keep the shape simple. Terraced and semi-detached houses cost less per m² than detached, and a plain rectangle beats a complicated footprint.
- Don't trim the contingency to make the number look nicer. An honest 10% to 15% is what keeps a surprise from becoming a crisis.
- Check the Extras & fees count. The little badge on the tab tells you how many extras are ticked. Make sure each tick matches reality.
- Get the ground checked early. Switching from easy to difficult ground adds 20% to the build rate. A survey costs far less than a nasty surprise at foundation stage.
- Sort party walls early. Notices have a time limit and disagreements add fees, so serve them well before your start date.
- Ask how VAT will be handled. For a new build, the construction price shouldn't include 20% VAT.
- Compare quotes line by line. Put a builder's quote next to the Breakdown tab. Big differences usually reveal something that has been left out.
- Use the By region tab as a reality check. If a quote is far above the figure for your region and finish, ask why.
- Get three quotes anyway. A good building cost calculator UK homeowners can trust gets you to a sensible budget, and this house construction cost calculator is built to do exactly that. It can't replace someone looking at your drawings and your site.
What the calculator doesn't include
- Furniture, curtains, appliances beyond the kitchen allowance, and garden landscaping
- Driveways, boundary walls and outbuildings
- Site insurance, Community Infrastructure Levy and interest paid during the build
- Temporary accommodation and moving costs
- Any VAT you could reclaim through the self-build scheme
- Planning and building control rules specific to Scotland, Wales and Northern Ireland
Where the figures come from
We checked the rates and rules in this guide against these sources:
- HMRC's published VAT guidance for the building and construction industry, for every VAT rate.
- HMRC's guidance on reclaiming VAT on a self-build home.
- The official England planning fee schedule, for the £548 and £610 fees.
- Build It magazine's self-build cost guide and other current UK cost guides, for per-m² price ranges.
- Published council building control schedules, and current party wall and structural warranty price guides, for typical fees.
Frequently asked questions
Tap a question to see the answer.
How much does it cost to build a house in the UK?
A typical self-build costs around £2,500 to £3,000 per m² for construction alone, according to Build It magazine's self-build cost guide. With fees, planning, a warranty, contingency and VAT on fees, this calculator puts an average 120 m² detached house in the Midlands at about £388,000, or £3,234 per m² all-in. Region and finish level move that a lot: about £308,000 on a budget finish and £659,000 at luxury, for the same house.
How much does it cost per square metre to build a house in the UK?
In the calculator, between £2,000 and £4,200 per m² from Budget to Luxury in the Midlands, before the regional multiplier, fees and VAT. That is roughly £186 to £390 per square foot, so the cost per square foot to build a house in the UK on the same basis is about £232 at Standard finish.
How accurate is this house build cost calculator?
It is an estimate, not a quote. The arithmetic, the VAT rules and the statutory fees were checked line by line against HMRC and GOV.UK guidance, and the build rates against up-to-date UK cost guides. Real projects still vary with design, site conditions and what local builders are charging, which is why we show a likely range (10% below to 15% above) and suggest getting three quotes.
Is VAT charged on a new build house in the UK?
Building a new home from scratch is zero-rated, so a VAT-registered builder should not charge VAT on the construction. Professional fees from architects, surveyors and consultants are still charged at 20%. Self-builders who pay VAT on materials can claim it back through HMRC's DIY housebuilders' scheme.
How much does a house extension cost per m² in the UK?
Guides generally quote £1,800 to £3,000 per m² for a single-storey extension, with higher prices in London and the South East. The extension cost calculator uses £1,800, £2,400, £3,000 and £3,800 per m² for Budget to Luxury in the Midlands. After fees, contingency and 20% VAT, a standard 20 m² extension comes out around £71,500, or £3,576 per m² all-in.
How much does a loft conversion cost in the UK?
Most guides put it between roughly £1,200 and £2,800 per m², depending on type. In the loft conversion cost calculator, 28 m² in the Midlands comes to about £70,300 for a rooflight conversion, £82,600 for a rear dormer, £94,900 for a hip-to-gable and £111,300 for a mansard, including fees and VAT.
How much does it cost to renovate a house in the UK?
For a 90 m² house in the Midlands, the calculator gives about £115,600 for a light refresh, £226,100 for a full renovation and £355,600 for structural work. Those figures include one new kitchen and bathroom, fees, 15% contingency and VAT. If the home has been empty for two years or more, the 5% reduced VAT rate could cut the full renovation figure by around £25,500.
Do I need planning permission for an extension or a loft conversion?
Not always. Many single-storey rear extensions and some loft conversions are permitted development, but conservation areas, flats, listed buildings and homes that have already been extended can change that, and mansard roofs usually need permission. You need building regulations approval either way. Ask your council or use the Planning Portal before you commit. In the calculator, tick or untick the Planning permission pill to match your answer.
How much contingency should I add?
10% suits a well-designed new build with a clear specification. 15% is sensible for a renovation or an older property where you can't see behind the walls, and some people go to 20% on complicated projects. The calculator offers 5%, 10%, 15% and 20%. Cutting contingency to make the headline number look better is one of the easiest ways to end up short.
Can I reclaim VAT on a self-build?
Yes, for a qualifying new home. HMRC's DIY housebuilders' scheme refunds VAT on building materials, normally if you claim within three months of completion. It only refunds VAT that was correctly charged, and this calculator does not deduct it, so your real cost may be lower than shown. See the GOV.UK page linked in the VAT section.
Does the calculator work for Scotland, Wales and Northern Ireland?
Yes. Build rates are adjusted for all three. However, the statutory fees follow England's rules: planning at £548 and £610, and typical building control charges. Scotland uses building warrants and its own planning fee scale, and Wales and Northern Ireland have their own schedules, so check those two lines locally.
Does the total include the cost of land?
Only if you type a price into the Land cost box (New build, Extras & fees). It is added at the end with no VAT and left out of the likely range and the per-m² figures, so the build costs stay comparable from project to project.
Why is the all-in figure higher than the rate I was quoted?
Quoted rates are usually construction only. The all-in figure adds professional fees, planning, building control, contingency, any warranty and the VAT that applies to your type of project. On the default new build that moves the cost from £2,500 to £3,234 per m².
Is the calculator free, and can I put it on my website?
It is free, with no sign-up. You can place it on your own site with the embed code at the bottom of this page.
Add this tool to your website
Run a property, DIY, mortgage or home improvement site? You're welcome to put this calculator on your own page for free. Copy the code below and paste it into the HTML view of your post or page. The calculator always loads our latest version, so the rates and rules stay up to date without you doing a thing. Please leave the small credit link under it in place. If the calculator looks too short or too tall on your layout, change the height value.

No comments:
Don't add any Spam link in comment box.